NOTE: Based on customer feedback regarding confusing functionality, the AI Search feature has been disabled. The excellent Keyword search continues to function normally. The Aspire team strives to optimizes the platform search tools to provide the best customer experience possible.

Assign equipment to a crew member

Prev Next


 Use the below-listed information to assign an equipment asset to a specific crew member for recordkeeping from the Start/Stop Work screen. 

Configuration requirements 

These requirements must be met to add time to an equipment item from the app. 

  • Allow Equipment Time Reporting must be enabled on the details screen for the route associated with the work ticket. 
  • The equipment item must have the Allocate from Mobileadministrative function enabled. 
    • Best Practice Tip: The purchase and allocation units should be specified as hours.

Instructions 


1. After ensuring the above-listed requirements are met, select the equipment selector button underneath the crew member name to which you want to associate an equipment item on the Start/Stop Work screen.              

2. Select the equipment asset from the Select equipment screen. 

  • Remember to associate an equipment item with a crew member before selecting Start Work.
  • The Select equipment drop-down will contain equipment included in the opportunity or as a subcontractor expense associated with the work ticket. 

3. Select the Back button to return to the Ticket details screen. 

Keep in Mind 

  • Equipment is allocated to a job based on the time spent and the unit price designated in the item catalog. 
  • This feature is not available for all users. If you do not have the option to associate equipment with a crew member, reach out to an administrator to see if the feature is supported for your company.